Barking Riverside Concrete Ramp Demolition – CAT III Check

Barking Demolition - Cat III check

The redevelopment of the Barking Riverside area required the demolition of a redundant reinforced concrete ramp. This ramp was connected to a bridge over the railway, and going down between railway lines. Ensuring its stability throughout the demolition sequence was therefore imperative. Due to the proximity of the railway, we carried out a cat iii […]

Gantry Installation – Sutton

Bridge Gantry Temporary Works Design

Moreland provided the temporary works design of piling mats, crane lifts, pier stability system and bridge load checks for a tandem lift. These works were part of the project to install a new gantry over a <name> railway. This project arose from the necessity of installing a pipe bridge over a railway to support heating […]

Upper Holloway Project

Cat iii checker upper holloway

The Upper Holloway project, delivered by Hochtief with temporary works design by Andun, is a typical example of the value added by Moreland conducting Cat iii checks. The project comprised the replacement of a bridge supporting the A1, with the associated building of a dedicated services bridge. The two bridges are over the railway lines […]

Footbridge Replacement Paddington

The Great Western Railway electrification is part of the biggest investment in the railway since Brunel built it over 150 years ago and is designed to create faster, more reliable services, better stations and increase freight capacity. Over the Christmas period of 2016 engineering work was undertaken to enable electrification to take place. Part of […]